CoupeFab

Shop · costing

Quoting laser and plasma cut parts: a complete costing method

Material with real nesting utilization, cut time (length + pierces), machine hourly rate, consumables, setup, deburring, bending and margin: the step-by-step method with a template worksheet, no made-up numbers.

Reviewed 3 min read Level : Intermediate DraftWritten by CoupeFab from the official documents cited. Technical review by Michaël Brassard pending.

A cut part price isn’t “part weight times the price of steel”. It adds up the material actually consumed, machine time, secondary operations and setup, then a margin. Specialized quoting software uses the same logic; here it is by hand.

The basic formula

Cost per part = material + cut time × machine rate + consumables + (setup ÷ quantity) + secondaries

BlockHow to calculate itWhere the data comes from
MaterialPart area ÷ nesting utilization × thickness × density × price per weightReal nest (see Nesting); density and published prices in the price comparison tool
Cut timeCut length ÷ speed + pierce count × pierce time + rapid movesCut chart (see Reading cut charts) or CAM estimate
Machine rate$/h including depreciation, power, gas, maintenance, operator, overheadYour own figures (see Shop hourly rates (Quebec))
ConsumablesCost per pierce or per arc-hour (plasma), nozzles and windows (laser)Your wear records
SetupProgramming, loading the sheet, adjustment, first articleMeasured actual time
SecondariesDeburring, bending, tapping, welding, paint, packingStandard time per operation

Template worksheet (columns)

ColumnExample content
Part / revisionP-1024 rev. B
Material, grade, thicknessA36, 1/4 in
Quantity50
Part area(from CAM)
Utilization(from nest)
Cut length(from CAM)
Pierce count(from CAM)
Calculated cut timeformula
Machine rateyour value
Material costformula
Secondariesminutes × rate
Setup per partminutes ÷ quantity
Unit price, total priceformula + margin

Step by step

  1. Read the drawing: material, grade, thickness (gauge and decimal, see Sheet metal gauges), quantity, tolerances, finish.
  2. Measure the geometry: total cut length and contour count (CAM or nesting software provides them).
  3. Nest on the real sheet size to get utilization and parts per sheet.
  4. Price material: decide whether scrap is billed (often yes, fully or partly); use a current supplier price.
  5. Price time: chart speed for the thickness, pierce time, allowance for slowdowns (corners, small holes).
  6. Add consumables, setup, secondaries.
  7. Apply margin and sanity-check against the market.
  8. Write assumptions on the quote (material supplied or not, tolerances, edge finish, lead time, material price validity).

Common mistakes

MistakeEffect
Material at net part weightScrap unpaid, margin lost
Ignoring piercesHeavily perforated parts underpriced
Using the chart’s maximum speedTime underestimated; the machine slows in details
Forgetting deburringUnbilled labour
Stale material priceLoss when price rises between quote and purchase

Checklist before sending

  • Material price checked this week (published prices move; see the price comparison tool)
  • Sheet size available from the supplier
  • Deburring and edge requirements included (see Deburring and finishing)
  • Minimum quantity or setup charge stated
  • Quote validity and shipping terms

FAQ

Should scrap be billed?

It’s a business decision; many shops bill the full sheet for small runs and a utilization percentage for large ones. Put it in the quote.

How do I get my hourly rate?

Divide all annual costs of the machine and its operator by truly billable hours; see Shop hourly rates (Quebec).

Sources

Spotted an error or want something added? Tell us →

One guide a week, French-first

New guides, used equipment in Quebec and price moves. No third-party ads.

CASL compliance: the box is not pre-checked. Nothing is sent without this express consent.